Harper James advises ambitious UK businesses on commercial property matters under the laws of England and Wales, including the consent process for building works. A licence to alter is the landlord’s formal approval for changes to leased premises, and obtaining it before work starts protects the tenant’s lease, budget and timetable.
Check the lease before instructing contractors. A licence is usually required for structural works, changes to the layout, new plant or equipment, alterations to services, signage, cabling, air conditioning and changes affecting fire safety or access. Even apparently minor works can trigger the consent requirement. The lease often also requires planning permission, building regulations approval, freeholder consent or approval from a managing agent.
The process starts with a scope of works, drawings, specifications, contractor details and programme. The landlord then reviews the proposal, often using its surveyor and solicitors. The tenant normally pays the landlord’s reasonable professional costs and accepts conditions covering insurance, health and safety, working hours, access, protection of common parts and reinstatement. A practical overview of related commercial property issues is available in this commercial property guidance.
Read the consent document alongside the lease. It should identify the approved works precisely, state who owns fixtures and improvements, and record whether the tenant must remove them at the end of the term. It should also address asbestos information, statutory approvals, warranties, certificates and the handover of operation and maintenance manuals.
The tenant should resist vague obligations that create an open-ended reinstatement cost. Agree the specification early, retain evidence of approvals and photograph the premises before and after the works. If the landlord requires a separate reinstatement deed or rent deposit, include those items in the project timetable and budget.
Starting works without consent is a breach of lease and can delay a refinancing, assignment or sale of the business. Retrospective consent is not a reliable substitute for advance approval, particularly where the landlord’s surveyor identifies defective work or missing certificates. Current projects also require careful attention to energy performance, accessibility, fire safety, telecommunications infrastructure and the effect of alterations on future EPC or building management requirements.
A sensible sequence is: review the lease, define the works, obtain professional drawings, check planning and building regulations, submit the consent pack, negotiate the conditions, sign the licence, then start on site. Harper James can coordinate the legal review with the tenant’s surveyor, project manager and contractor so that the licence reflects the work actually being delivered.