Harper James is a UK full-service commercial law firm advising ambitious businesses on the laws of England and Wales, including commercial property matters. In a commercial lease, repair obligations determine who pays for defects, maintenance and reinstatement, so they need review before signing and throughout the tenancy.
Commercial repair liability is mainly contractual. The wording may require a tenant to keep the interior in good repair, maintain installations, redecorate periodically and return the premises in a specified condition. A full repairing and insuring lease places wider obligations on the tenant, often covering the whole building or a proportion of shared areas. The tenant must check the repairing covenant, service charge provisions, rights of access, insurance terms and any exclusions for structural defects or damage caused by insured risks.
A schedule of condition records the premises at the start of the lease. It provides an agreed benchmark for the tenant's repairing liability and is particularly useful where the property is already worn. Before completion, a tenant should compare the schedule with the lease, inspect roofs, windows, mechanical systems and external areas, and identify defects that require a landlord's works or a specific exclusion. Further reading on commercial lease reviews can help businesses organise that review.
Dilapidations are breaches of repairing, reinstatement, decoration or removal obligations. A landlord may serve a schedule during or at the end of the term and seek the cost of putting matters right, subject to the lease and applicable legal limits. The tenant should not assume that carrying out works is always the best response. The lease term, proposed redevelopment, remaining rent, reinstatement wording and evidence of the property's condition all affect the commercial position.
A sensible process starts with an early inspection, followed by a surveyor's cost assessment and a legal review of liability. The tenant can then decide whether to carry out works, negotiate a settlement or challenge items that fall outside the covenant. Keeping inspection reports, maintenance records, photographs, invoices and landlord correspondence supports that assessment.
Repair obligations increasingly sit alongside energy performance, building safety, accessibility and sustainability requirements. These are not automatically the same as a tenant's repairing covenant. The lease should state who deals with compliance works, statutory notices, improvement costs and service charge recovery. Tenants should also check alteration controls before installing equipment, changing layouts or carrying out energy improvements, because consent and reinstatement obligations often interact.
For a practical lease review, map each obligation against the responsible party, trigger, approval process and likely cost. Address unclear wording before signing, record the property's condition at entry, and schedule inspections well before a break date or lease expiry. That approach gives the business time to price works and negotiate rather than discovering its exposure at the end of the term.