Construction Finance Security: What Lenders Require

Harper James advises businesses on construction finance, lending and commercial contracts under the laws of England and Wales. Lenders assess both the borrower’s ability to repay and the assets, contracts and project controls available if the development encounters delay, cost overruns or contractor failure.

Security over the borrower and project

A lender commonly requires a debenture from the borrowing company. This usually creates fixed and floating charges over the company’s assets and supports enforcement if the borrower defaults. For property-backed development finance, the lender normally takes a legal charge over the development land. Where the borrower is a special purpose vehicle, lenders often require a share charge over its shares and guarantees from other group companies or sponsors.

The security package can also include personal guarantees, although their scope and financial limits are negotiated. Lenders review the borrower’s existing charges at Companies House and the title to the land to confirm priority. The borrower must register relevant security within the required period and obtain consents where existing finance, leases or other rights affect the project.

Security over construction arrangements

Lenders usually require control over the contracts that generate value in the project. This includes assignments of development agreements, professional appointments, construction contracts, sales contracts, rental income and insurance policies. Collateral warranties or third-party rights from the contractor, architect, engineer and other key consultants give the lender contractual rights relating to design, performance and defects.

Step-in rights are also common. They allow the lender, after a default, to require the relevant parties to continue performing their contracts while the lender arranges a remedy or replacement of the borrower. The effectiveness of these rights depends on properly drafted notices, direct agreements and contractual consent provisions.

Conditions before funds are released

Before the first drawdown, the lender typically requires evidence of planning permission, satisfactory title, building contracts, professional team appointments, insurance and an acceptable valuation. An independent quantity surveyor often reviews the construction budget, programme, contingency and payment applications. The lender then monitors progress through regular reports and limits drawdowns to verified work completed.

Finance documents also address cost overruns, delays, changes to the works and contractor insolvency. The borrower is commonly required to provide additional equity or other agreed support when project costs exceed the approved budget. A legal review should confirm that the proposed security is enforceable, ranks correctly and matches the rights granted under the construction and property documents.