Harper James advises businesses on the legal and commercial issues that arise when assessing property development projects under the laws of England and Wales. A feasibility check tests whether a proposed development is viable before substantial funds are committed to acquisition, design, finance and construction.
The process usually begins with the site and its title. A review should identify ownership, access rights, restrictive covenants, easements, leases, overage provisions, ransom strips and other restrictions affecting development. Planning research then considers the local development plan, planning history, permitted use, development constraints, environmental designations, highways requirements and the likelihood of obtaining consent. A planning appraisal is informative, but it does not replace a formal planning application.
The financial model should record the acquisition price, stamp duty land tax, professional fees, planning costs, construction costs, finance charges, insurance, marketing, sales costs and contingency. It should also test expected rental or sales income, programme delays, interest-rate changes, construction-cost increases and changes in market demand. The output is normally a residual land value or development profit assessment, supported by clear assumptions and sensitivity analysis.
Technical investigations commonly cover ground conditions, contamination, flooding, ecology, utilities, access, demolition requirements and the condition of existing structures. A measured survey, building survey and initial cost plan help establish whether the proposed scheme is physically deliverable. Construction arrangements should then be considered, including the form of building contract, consultant appointments, design responsibility, collateral warranties, insurance and contractor security.
The acquisition contract must reflect the findings of the feasibility work. Common protections include conditional contracts, overage arrangements, option agreements, planning promotion agreements and warranties from the seller. The buyer also needs to assess tax, funding conditions, joint venture terms and exit arrangements. Where a site is occupied, vacant possession requirements and the timing of lease termination form part of the feasibility assessment.
A final feasibility report should separate confirmed facts, professional assumptions and unresolved risks. It should set out the proposed use, planning position, development programme, total cost, funding structure, projected return, key dependencies and conditions precedent to acquisition. The project team can then decide whether to proceed, renegotiate the price, alter the design, obtain further investigations or reject the site.
A legal review is most effective when carried out alongside planning,
surveying, valuation and construction advice. It identifies title and
contract issues early, aligns the acquisition documents with the
development strategy and records the risk allocation before the project
reaches exchange or financial close.