Harper James advises UK businesses on commercial property matters under the laws of England and Wales, including consent for alterations to leased premises. Alteration works affect both the tenant’s rights during the lease and its obligations when the lease ends.
A commercial lease normally distinguishes between structural alterations, non-structural alterations and changes to services or building systems. The lease may prohibit some works entirely and require the landlord’s written consent for others. Consent requirements often cover partitioning, installing equipment, changing layouts, signage, cabling, air conditioning and alterations affecting the building’s structure or appearance.
A tenant should review the alienation, alterations, repair, insurance and reinstatement clauses before instructing contractors. The landlord may require plans, specifications, method statements, building regulations approvals, planning permission, insurance information and evidence that qualified contractors will carry out the work. Consent is usually documented through a licence to alter. Starting work without the required consent breaches the lease and creates enforcement, insurance and end-of-term cost issues.
A reinstatement obligation requires the tenant to remove alterations and return the premises to the condition required by the lease. This can include removing partitions, cabling, signage, specialist installations and raised flooring, as well as repairing resulting damage. The obligation depends on the lease wording and any conditions attached to the landlord’s consent. A licence to alter can preserve, modify or extend the reinstatement requirement, so it should be negotiated alongside the proposed works.
Tenants should assess reinstatement costs before approving an alteration programme and retain the lease, licence, drawings, photographs, approvals and completion records. Near lease expiry, the tenant should obtain a schedule of works, confirm access and contractor requirements, and agree with the landlord whether any items can remain. A written waiver or agreement is needed to avoid later claims for dilapidations. The landlord’s acceptance of the works or continued occupation does not, by itself, remove the contractual obligation.
The key questions are whether consent is required, what documents the landlord needs, who pays professional fees, whether the works affect rent review or insurance, and whether reinstatement applies at lease expiry or earlier termination. These points should be settled before committing to construction costs. A tenant negotiating a new lease should also seek clear drafting on permitted alterations and limit reinstatement to works identified in the licence to alter, where commercially appropriate.